I got back from Thanksgiving travels and finally got some time in on the build. I hope your travels, if any, went well. Below are photos of my latest progress.
1. I concentrated on getting the front deck installed. Here I installed the quarter round deck supports.
2. The piece for the deck was a fair amount larger than needed. So I put it in place, traced the edge, and trimmed leaving extra just to be safe.
3. Then I stitched it into place, did a saturation coat, and used 4oz glass. Note that it stays inside the stitch area not out to the edges. This helps it hold the shape for glassing the other side.
4. I took the deck off. It mostly holds it shape but flexes back some. So I used some string into the last two stitch holes to pull the curve back to where it should be. I took a measurement when the deck was in place to get the distance from the top of the curve to the plane at the bottom. That guided how tight to pull the string. Then I did a saturation coate and 4oz glass of the inside of the deck.
5. Then I tack welded the deck in place and sanded it clean to the hull. I'll glass over the whole deck and bond to the hull with 4oz after I glass the hull bottom. The extra 4oz minimizes oil canning with the thin 3mm ply.
6. Installed quarter round deck supports to aft deck area.
7. I use the aft storage area basically as a large cooler for what I catch. On the Sabalo 12 I tried insulating the area with a new insulating paint developed by NASA. Unfortunately it proved ineffective. So I'm going to try using pink foam-board insulation. It will have a layer of 1mm ply over it to make it water-tight. Below is the foam-board installed with Liquid Nails to the back of the rear-bulkhead.
8. Below is the 1mm Okume ply filleted to the hull and quarter-round over top of the foam-board. I'll put a couple of layers of epoxy on the ply. I coated the inside of the ply before install. I'll be using this same routine on the inside hull sides/bottom and the underside of the aft deck/hatch. More photos of this as I progress.
9. I'm going to jump to glassing the hull exterior next. I'm awaiting some gear to be delivered to be installed on the aft deck. Unfortunately it's going to take a week or so to arrive. So I'll save the aft deck install until after I've glassed the hull.
I'm getting there!